Exile Nexus

Radius jewel sockets

Where should a Time-Lost jewel, Heroic Tragedy, Undying Hate or Controlled Metamorphosis go? Pick the jewel’s radius and see, for every jewel socket on the passive tree, how many notables and small passives it reaches. Type a stat to count the passives you care about.

Small radius: Time-Lost jewels (Time-Lost Sapphire, Time-Lost Diamond, Time-Lost Emerald, Time-Lost Ruby)

Loading the passive tree…

Radius 1200 tree units (Path of Building’s sizes). Lit: passives in the radius. Click another jewel socket to pick it.

All 12 jewel sockets Small radius, best first

#SocketNotablesSmallAttr.Keyst.Points
1North-west, near Investing Energies64 passives15454010Druid
2North-west, near Blessing of the Moon38 passives9281014Witch / Sorceress
3North-east, near Brain Freeze40 passives8283114Monk
4South-east, near Bond of the Wolf35 passives8261014Ranger / Huntress
5East, near The Howling Primate34 passives8233014Monk
6North-east, near Spellblade33 passives8214010Monk
7North, near Ice Storm49 passives7375010Witch / Sorceress
8South-west, near Battle Trance25 passives7162014Warrior
9South-east, near Freedom of Movement32 passives6215010Ranger / Huntress
10South, near Distracting Presence27 passives6165010Mercenary
11South-west, near Unbending33 passives4254010Warrior
12West, near Flamekeeper32 passives4243114Warrior

Radii. Sizes are Path of Building’s (its jewel radius table times the game’s jewel distance multiplier, 1.2): Small 1200, Medium 1380, Large 1560, Very Large 1800 tree units; Controlled Metamorphosis’s rings from 780–1140 (Very Small) to 2160–2520 (Massive). A passive counts when its centre is inside, as in Path of Building. We have not checked them against the game files.

Small passives are the plain ones that “Small Passive Skills in Radius” affects; attribute passives (+5 to any attribute) are counted on their own, as Path of Building leaves them out of that. Ascendancy passives and the Sinister jewel sockets are not counted.

Points are the passives to allocate from a class start to the socket, the socket included, along the shortest path (as the tree planner paths). Tree 0.5.